| U.S. 60 to Gonzalez Pass | $3,040 |
| Upgrade and Widen SR 85 to I'10 (Mileposts 120'141) | $1,200 |
| Improving Lone Pine Dam Road in Navajo County | $2,000 |
| Burro Creek section between Wikieup and the Santa Maria River | $800 |
| Pinal Avenue/Main Street right-of-way acquisition'Pinal County, Casa Grande, AZ'To reconstruct Main St. to include a bypass for commercial traffic | $800 |
| Navajo Route 20/Navajo Nation, Coconino County, AZ/To Conduct a 2-lane road design for 28 miles of dirt road between the communities of Le Chee, Coppermine, and Gap | $800 |
| Kabba Wash project between I-40 and Wikieup | $1,600 |
| Construct a passing lane between the north end of Lake Havasu City to I-40 | $1,600 |
| Construct the Rio Salado Parkway to connect I-10 and Loop 202 freeways to 7th Street in downtown Phoenix. | $6,400 |
| Navajo Mountain Road on the Navajo Nation. | $1,000 |
| Construct link from Twin Peaks Road to I-10 and Linda Vista Blvd. including bridge over Santa Cruz River and overpass of Union Pacific Rail Road. | $4,800 |
| Design and construction of roadway improvements on U.S. 60 from 67th Avenue to McDowell. | $1,600 |
| Construct pedestrian and bicycle overpass at McDowell Road and 35th Avenue in Phoenix. | $2,400 |
| Upgrade and Re-opening of Main Street in Yuma. | $960 |
| Paving of Navajo Route 9010- off of I-40 at Houck, AZ (Exit 348) to Pine Springs Day School | $3,440 |
| Grand Canyon Greenway Trails | $2,560 |
| Construct or Modify Railroad Grade Separations on 6th St. and 22nd St. and Reconstruct Speedway Blvd. Underpass in Tucson. | $10,640 |
| Replacement of Safford Bridge which crosses the Gila River directly north of Safford, AZ on North 8th Avenue | $3,520 |
| Realign Davis Road from State Route 80 to State Route 191. | $2,640 |
| Construct bridges at Aspen St., at Birch St., at Cherry St., at Bonito St., at Thorpe St | $3,000 |
| State Route 77/Project funds for the Ore Trail in the Copper Corridor on SR 77 | $240 |
| Many Farms, Apache County-- For the Construction of N8086 and N8084 on the Navajo Nation. | $480 |
| Widen I-10 to 3 lanes in each direction north of Tucson from Marana Interchange to Cortato Interchange. | $1,360 |
| Design, right-of-way acquisition, and construction I-10 Collector Distributor Roadway from 40th Street to Baseline Maricopa County, Arizona. | $3,200 |
| Pliocene Cliffs reconstruction between Wikieup and the Santa Maria River. | $800 |
| Scott Ranch Road. Navajo County--Connect White Mountain Road (SR 260) and Penrod Road (SR 77). | $1,000 |
| Design and Construction of Rio Salado Pedestrian Bridge in Tempe, AZ. | $2,400 |
| Widen and expand the existing roadway and railroad overpass in the Houghton Road Corridor | $4,000 |
| U.S. 60 and U.S. 93 connection on the eastern edge of central Wickenburg | $1,600 |
| Design and construct bridge and roadway approaches across Tonto Creek at Sheeps Crossing south of Payson, AZ | $2,960 |
| Pave remaining stretch of the Turquoise Trail, BIA Route 4, which is a north- south road that joins AZ HW 160 in the north to AZ HW 264 in the south portion of BIA Route 4 | $1,600 |
| Arizona Department of Transportation; for those projects it has identified as its highest priorities. | $41,335 |
| Replacement of Safford Bridge which crosses the Gila River directly north of Safford, AZ on North 8th Avenue | $3,665 |
| State Route 85 Upgrade | $3,000 |
| "Phoenix, AZ Construct City of Phoenix para-transit facility (Dial-A-Ride)" | $836 |
| "Phoenix, AZ Construct metro bus facility in Phoenix's West Valley" | $4,180 |
| "Phoenix, AZ Construct regional heavy bus maintenance facility " | $836 |
| "Scottsdale, Arizona-Plan, design, and construct intermodal center" | $2,090 |
| "Tempe, Arizona-Construct East Valley Metro Bus Facility" | $5,434 |
| "Coconino County buses and bus facilities for Flagstaff, AZ" | $1,045 |
| "Coconino County, Arizonia-Bus and bus facilities for the Sedona Transit System " | $794 |